Front View298 viewsHey, what happened to the car? Notice the openings in the exterior wall on the front, there will be down lighting inside these. There are glass blocks on either side of the front door and window.dozer
|
|
Poured Foundation297 viewsThe poured foundation - which includes the outside ground beam (plus interior ground beams) and the poured floor surface. The floor was poured on top of the ground beam, so the level of the foundation increased by appx. 7 cm during the pour. Notice the plumbing in the bathroom and the vertical rebar each 40 centimeters.
dozer
|
|
Front of House297 viewsThe front of the house. Note the window openings each have a vertical rebar column on each side. A 10 cm beam will be poured across the top of the window and door openings at a 2.1 m distance from the floor.
dozer
|
|
Different Size Crushed Stone295 viewsNotice the two different sizes of crushed stone aggregate that will be used. The smaller one on the left is used for concrete which will be poured into the large cinderblock holes.
dozer
|
|
Tubing Used for Level of Beam #2295 viewsThin plastic tubing which is filled with water is used to determine a level horizontal line for the 10 centimeter beam which will run along the entire structure above the window level. The beam will be located between 2.1m - 2.2m from ground level.
dozer
|
|
Decorative Glass Blocks293 viewsThe design calls for decorative blocks at several places. Within the bathrooms the blocks are laid in place 2 thick. Each block is 8 cm wide and the rendered wall will be 16 cm - 18 cm wide (the oversize cinder blocks at 16 cm wide). Notice the use of 1 cm wood spacers, which keep the blocks and equal distance apart. Both wood and prefabricated plastic spacers were used.dozer
|
|
Visual Roof Inspection291 viewsAs long as there is none of the foil insulation which adheres to, and is installed at the same time the cement tiles are installed, the roof can be inspected visually during rain storms for leaks. If the foil has been applied any roof leaks will be much harder to find and repair. dozer
|
|
Ready Mix Pour of the Floor288 viewsNote the consistency of the concrete. It should have just enough moisture to be able to work it and not be watery.
dozer
|
|
Concrete Flooring286 viewsHere the surface has been smoothed and is almost complete. Notice how there is only a very thin layer of moisture on the surface. Water is an enemy of concrete, too much is not a good thing.dozer
|
|
6mm Tie-in Rebar285 viewsThis shows a piece of 6mm rebar which sits in between blocks as they are laid and goes through the column framework. This is used to secure the blocks on either side of the column together.dozer
|
|
Heavy Metal Box Construction285 viewsThe metal used in the critical elements of the roof structure is 4" x 2" box section which is 3.2 mm thick of the heaviest grade of metal (heavy duty).
dozer
|
|
Missing Foundation Columns281 viewsThis structure only has two traditional foundation columns, located at the front side of the front patio. The other columns have been replaced by the load bearing walls used as an integral part of the design.dozer
|
|