Most viewed - House Construction
IMG_1783.jpg
Paint Track66 viewsA paint tray used to be able to dip the structural steel tubing into the primer paint.dozer
IMG_9008.jpg
Window Opening being Squared66 viewsHere the opening is in the process of being squared. dozer
IMG_9195.jpg
Kitchen Cabinets Formation66 viewsShows the kitchen cabinets which are constructed of red bricks being formed. The walls of the kitchen have been roughed to 1.5 meters to allow for the wall tiles. dozer
IMG_9224.jpg
Shower Enclosure66 viewsThe shower enclosure showing the blue glass blocks laid in place to be flush with the ceramic tile finish upon completion. dozer
IMG_1609.jpg
Good Thing Electrician Stopped By65 viewsThis PVC will be positioned in the driveway so the underground electric conduit can later be run under the driveway in the opening provided.dozer
IMG_1805.jpg
Trenching the Underground Conduit65 viewsThe HDPE black underground electric conduit being laid in a trench in the routing from where the meter will go to the electric control panel. dozer
IMG_2863.jpg
Attic Light Switch65 viewsAttic fitted with florescent lighting and surface mounted switch box. dozer
DSCN0486.jpg
Bedroom65 viewsThe bedroom window view. The room is appx 6 m long by 4 m wide. dozer
IMG_9016.jpg
Archway65 viewsOnly the bottom portion of the archway is actually poured. The top of the archway (as seen to the left) will be continued using red bricks and mortar. dozer
IMG_9294.jpg
Framing for Top of Enclosure65 viewsThe framing for the top of enclosure. Notice the rebar lattice with spacing of 20 centimeters. The lid/service opening is sized at 50 centimeters by 50 centimeters. There is an entry pipe, water level solenoid pipe, and exit pipe (to feed to the automatic water pump into the house). dozer
IMG_9681.jpg
Water Heater65 viewsThis is the Siebel water heater as installed in the shower enclosure. The electric is fitted within the wall to feed to unit. Inbound water pipe is shown with an safety on/off valve at the junction with the wall. dozer
IMG_9190.jpg
Wall Ground Beam65 viewsThere are footings at approximately 2.5 meter intervals below this beam that is being poured. Notice the column frames extending from the beam.dozer