Most viewed - House Construction |

Sika Water Proofer67 viewsSika 'gan sum' waterproofing agent is added to the concrete mix.dozer
|
|

Kitchen Painting67 viewsThe kitchen being painted. The paint used was super shield (both primer and the finish coat). The kitchen and bathroom are semi gloss (washable) while the rest of the house are done in matte. dozer
|
|

Counter Tiles67 viewsThe kitchen cabinet tiles are off white tiles spaced at 3 mm intervals. dozer
|
|

Removal of Plastic Sheeting67 viewsThis stuff is great, look, no spots!dozer
|
|

Granito Tiles67 viewsThe granito tiles used in the front room and thicker and heavier than normal ceramic tiles. dozer
|
|

Finished and Grouted Bedroom Tiles67 viewsdozer
|
|

Destination for the Main Panel66 viewsThe main electric control panel will be fitted above these lengths of electric conduit.dozer
|
|

Underground Electric Conduit66 viewsThe underground electric conduit as it runs in a trench. dozer
|
|

TV Satillite Routing Cable66 viewsThe external box which holds the RG6 cable routing. There are two cables coming in and 4 cables going out to feed the various TV connections. This splitter is powered (it is unplugged in the picture).dozer
|
|

Preliminary Layout of Septic Access66 viewsAfter this we vented the septics and change the access lids to the 6" heavy duty type. dozer
|
|

6" Septic PVC Access and Lid66 viewsThe 6" Septic PVC access lid is covered in preparation for the walkway pour. Note the 6 hun vent pipe extending from the septic. It will be vented up through the wall and roof with the other vent pipes from the project. dozer
|
|

Rough Bathroom Layouts66 viewsThe drain pipes for the floor drains are 3 inch, toilets are 4 inch, sinks are 1.5 inch. The purpose of the internal formwork is to later pour the shower floors since they will be a lower level. dozer
|
|
943 files on 79 page(s) |
 |
 |
 |
 |
 |
44 |  |
 |
 |
 |
|

|
|
|