Dipping Beams68 viewsThis isn't the best way to paint the steel tubing, it uses too much paint (as it turns out) and unless the metal is extremely clean (as in wiped clean with thinner) the coverage is spotty. dozer
|
|

Entry Patio68 viewsThe patio entry area. The same granite type bezen tiles used on the drive way. White aluminum doors and windows with 1.5mm aluminum. dozer
|
|

Bathroom Door Frame68 viewsNotice the external bathroom wall. The door frame is affixed in two vertical beams + there is the associated lintel beam on top of the door frame. The extended beam is necessary due to the height of the wall. dozer
|
|

Rebar Framing for Water Tank68 viewsThe rebar framing is composed of 9mm SD30 strips wired together. The frame structure sits on 6 small footings. dozer
|
|

Grouting the Upper Edge of the Wall Tiles68 viewsApplying grout to the often overlooked upper edge of the wall tiles. If not grouted these will collect moisture in the open pockets and over time the tiles will become loose. dozer
|
|

Mains Electric67 viewsPulling up the mains electric as it will route to the control panel through the underground conduit. dozer
|
|

Configuring the Floor Electric67 viewsLaying out the location of the floor electric pop up electric boxes which will be in the study area of the house. dozer
|
|

Weather Proof Switch Boxes67 viewsThese are bticino weather proof switch boxes used on the exterior. dozer
|
|

Setting Up the Pump67 viewsBefore getting too far the pump needs to be set up for so the inbound lines can be pressure tested. Any problems can be checked/fixed before concrete is poured over any piping. dozer
|
|

Vent Pipes67 viewsVend pipes extending upwards, eventually routed through the roof tiles. Venting into the attic space is not a good move as it creates a possible odor problem. dozer
|
|

Study67 viewsThe study area utilizes walls that are 20 cm think so there is no column footprint visible. dozer
|
|

Septic Service Opening67 viewsThis shows the type of opening used for the 3 septic collections within the system. It is a threaded 6 inch brass lid fitted into a heavy PVC shell. This will be placed on top of the 4.5 inch hole in the lid of the concrete rings. dozer
|
|