Junction Box69 viewsA junction box in the attic. The connections are done with wire nut connectors and no tape.dozer
1 and 1/2 bathrooms69 viewsThe view of the beam setup for 1 and 1/2 bathrooms. dozer
Rough Plumbing Layout69 viewsAll of the inbound water pipes (1/2") and drain pipes ready for water pressure test. dozer
Bathroom Layout69 viewsBathroom nearing readiness to have the floors poured. The main floor will be poured first and then later the shower floors will be poured as they are at a lower level. dozer
Kitchen Counter69 viewsRebar meshing in the counter is laid in a 10 centimeter square mesh. Concrete will be poured in the forms to make the counter. There will be a place holder for the sink and faucet (on the right). dozer
Counter after Pour69 viewsThe bathroom counter after the pour. The faucet will set off to the right side of the sink where the PVC pipe is. dozer
Burying the PVC Pipe68 viewsThe PVC pipe will is being buried under where the driveway will be poured. The PVC pipe is a space holder for the HDPE underground electric conduit. dozer
Junction Box in Wall68 viewsA sunken junction box with a screw type connector. dozer
Routing Conduit68 viewsRunning conduit to its appropriate location. Notice that long lengths are wired to the roof structure to prevent sagging. dozer
Junction Boxes68 viewsVarious junction boxes and conduit routing in the attic. Notice that conduit is wired in place so it does not lay on the drywall ceiling. dozer
Pop Up Boxes68 viewsThe pop up receptacles as seen in the study. This one has a LAN connection and electric connection. dozer