Lightweight Aerated Blocks85 viewsThese light weight aerated blocks are 7.5 centimeters thick and 60 centimeters long and 20 centimeters wide. It is a wonderful material to use in construction of a house based on the column/pier system. dozer
|
|

Decorative Glass Blocks84 viewsThis shows the wood spacers used to maintain spacing with the decorative glass blocks, these are the vertical ones in the front of the house. The inside of the gap is reinforced (with rebar) concrete.dozer
|
|

Air Powered Nail Gun84 viewsEvery wood worker will have an air powered nail gun. They shoot small nails into the wood and affix to the sheetrock gypsum board. It is a pretty effective way of attaching trim wood that is used universally in Thailand.dozer
|
|

Column Frame Mesh84 viewsAnother view of the footing and column framework with a 1.5 liter water bottle for size reference. dozer
|
|

Kitchen Electric83 viewsElectrics for kitchen lighting above and below the cabinets along with a switch box and two receptacle boxes. dozer
|
|

Electric Running to Main Circuit83 viewsWhere the main electric control box will be. dozer
|
|

Wood in Rafters83 viewsHard wood is fitted in the end of the rafters to be used as a surface to install the fascia board. dozer
|
|

Applying a Primer83 viewsA good quality primer paint is used, TOA type for fresh concrete finishes (they have two types of primers, one for fresh concrete, the other for existing).dozer
|
|

PVC Door Supports83 viewsThe PVC door for the bathroom will deform easily. Therefore supports must be added to ensure that during the pouring of the vertical beams or the lintel that the door frame doesn't bend.dozer
|
|

Spacers in Preparation for Column Pour83 viewsSpacers are applied to the outside of the column frame so that the frame will remain centered within the form wood during the pour. dozer
|
|

Gable Vent82 viewsThe gable vent is installed. dozer
|
|

Door Frame82 viewsA vertical beam will be poured on either side of the door frame. The nail seen extruding from the frame is used as an anchor. It will become embedded in the poured vertical beam and lock the frame in place. dozer
|
|