|

Most viewed - House Construction |

Trim Wood Installation87 viewsGlue is applied to make a sealed bond with the sheetrock gypsum board.dozer
|
|

Soffit87 viewsThe soffit material is screwed into the suspension rails in 60 centimeter sections. Note that this nature board (Shera brand) and other soffit material is much more whether resistant than gypsum wallboard (even the moisture resistant kind). Most comparable houses use gypsum for the soffit material which isn't advisable. dozer
|
|

Spacers applied to Edge of Rebar Frame86 viewsThe spacers were used to keep the rebar from coming too close to the edges of the forms. dozer
|
|

Metal Spacer86 viewsA metal spacer is in place to set the position of the rebar during the walkway pour. It is good to use spacers in confined areas like this one which will not need to be walked on.dozer
|
|

Walkway on Top of Septic86 viewsHere the walkway is being poured behind the house. dozer
|
|

Lanko 70186 viewsThis is a high compressive strength non shrink grout which was used to top up any columns that were poured to an incorrect height.dozer
|
|

Walkway86 viewsTouching up paint and creating the attic walkway. dozer
|
|

Primer Second Coat86 viewsThe second coat of TOA outside primer is applied. This is one area where it doesn't pay to corner cut, although you can get by with a single coat of an inferior primer the paint job won't hold up as it will with premo paints.dozer
|
|

Column Frame Mesh86 viewsThe column footing frame is 90 centimeters wide (square) and includes a top and bottom lattice. The lower frame is composed of 9mm rebar with the column frame composed of 12mm rough with 6mm connectors. dozer
|
|

Fixing Roof Level85 viewsWelding in a small riser to correct the roof level. dozer
|
|

Smoothing a Render Coat85 viewsThis shows a broom being used to smooth an external render coat. The broom is used as the final step in the rendering process after the surface is smoothed with a sponge application.dozer
|
|

Skirting Board85 viewsThe skirting board is brand shera (same as the soffit material). It is affixed by drilling holes in the concrete wall and inserting a plastic grommet. Then a hole is drilled in the skirting board which then is drilled into place. The screws are countersunk so they are level with the surface. Then a white plaster is applied (as seen) to make the screw head undetectable. dozer
|
|
943 files on 79 page(s) |
 |
 |
 |
 |
 |
35 |  |
 |
 |
 |
|

|
|
|