Home > House Construction

Most viewed - House Construction
IMG_8828.jpg
Ring Beam98 viewsA ring beam is run horizontally around the entire structure below the window openings. Here we see the beam frame work in place. dozer
DSC03411.jpg
Poured Footing98 viewsThe poured footing. The footings are poured and then the ground beam is tied into place around the footing structure. dozer
IMG_8966.jpg
CPAC Monier Roof Tiles98 viewsThe CPAC Monier roof tiles being laid in place. These tiles are basically dummy proof, except at the valley and ridges. dozer
IMG_9782.jpg
Out of the Kitchen98 viewsWalking out of the kitchen to the front room. Notice on the right the power point mounted above the counter. Each power point has either 4 sockets or 3 sockets and utility plug for cable or telephone. There are nine power points located in the inside of the house.dozer
IMG_1600.jpg
Laser Level97 viewsChecking the layout with a laser level which shoots a beam straight ahead and also at a 90 degree angle as well as vertical. dozer
IMG_2135.jpg
Prefab Valley Material97 viewsThis is the chang prefabricated valley material as installed in a roof valley (shown from the inside). dozer
IMG_4286.jpg
Kitchen Counter97 viewsThe surface of the counter is applied with freshly mixed concrete (portland cement with addition of sand and small stone aggregate). The hole to the left is where the stainless steel sink will sit and the tube extruding from the counter is for the faucet.dozer
IMG_4318.jpg
Archway Support97 viewsThe start of the archway support structure. There will be concrete poured in forms above the archway which is supported by a rebar framework welded to the roofing metal.dozer
IMG_4654.jpg
Terrazzo Counter Polishing97 viewsA wet polish is done after the concrete has cured an adequate amount of time. Terrazzo takes an extended period of time and work hours to install.dozer
IMG_4848.jpg
Caulk Application to Counter Inserts97 viewsHere caulk is being applied to the joint between the wood counter door inserts and the inside of the opening. dozer
0809301341bextfromfrontright.jpg
Front from Right97 viewsDesigned for ease in parking with a large drive way parking area. The street level being at 0, the garden is +5, parking +10, patio +25, house +30 centimeters. dozer
shrencl.jpg
Shower Enclosure97 viewsThe water heater is a better quality SiebelĀ® model. The enclosure has glass blocks (opaque) for a light and open feel. dozer