happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Most viewed - House Construction
2008_07_23_G9_0039.jpg
Water Pump + Storage Tank146 viewsThe underground storage tank has about a 1500 liter capacity. The automatic pump on top pumps into the house, on the left is a deep water well which is activated by an electronic floater valve in the water tank. Notice also the natural red pigment finish on the perimeter wall.dozer
IMG_4811.jpg
Automatic Pressure Pump145 viewsThis pump will drive water from the storage tank to the house. dozer
IMG_9066.jpg
External Render143 viewsThe aerated blocks again use a specific product for the external render. It is a ready mix cement skim coat type product. It is easy to work and makes for a smooth and nice render finish. The final thickness of the walls will be 12.5 centimeters so this is being applied about 2.5 centimeters on each side. dozer
IMG_0100.jpg
Close up Glass Block Work142 viewsThis close up shows the glass blocks in the great room and the recessed ceiling lighting. The recessed lighting is controlled by 3 dimmer switches.dozer
IMG_0104.jpg
Front Exit141 viewsThe front exit onto the patio which is done with terracotta tiles. dozer
IMG_9720.jpg
Water Flow Test and Drainage PVC141 viewsThe drainage PVC has been installed in the proper places to allow the water to exit the site, as evidenced during this flow test. dozer
IMG_0037.jpg
Shower Stall140 viewsThe faucets + rain shower head are VRH non stainless with the non glossy look. dozer
IMG_0099.jpg
Patio Soffit139 viewsThis shows the soffit slats which are finished with 2" composite slats. These are much nicer looking that the flat panels and also allow easy air flow out of the attic. The arch way is done in a no paint skim coat that has the look of stone.dozer
IMG_1285.jpg
Footing Frame138 viewsThe footing frame in place with 5 cm. spacers on the bottom and the upright rebar indicating the center of the footing. dozer
IMG_4476.jpg
Electric for Perimeter Wall Lighting138 viewsThe perimeter wall lighting electric is routed via the edge of the driveway up through the front column above the wall. dozer
IMG_5035.jpg
Soffit Finish138 viewsThe exterior soffit finishing with the attractive 2" composite slats, much nicer + more expensive than the flat panels. There are two exhaust fans exit face plates attached to the soffit.dozer
IMG_9770.jpg
Shower Enclosure Upper Edge138 viewsThe upper edge of the shower enclosure, grout being applied.dozer
943 files on 79 page(s) 18

Debug Info 
Debug Output: show / hide