Most viewed - House Construction |

Block Formwork for Tank166 viewsThe cinder blocks are used as form work for the walls of the tank which are re enforced with rebar. dozer
|
|

Rebar Re Enforcement of Lid166 viewsThis shows the framework to support the top of the tank. The rebar used is 6 mm and is spaced about at 10 cm squares. The blue PVC is where the water will enter the tank from the deep artesian pump, the yellow is the electric which will be routed to the electronic valve for the tank and the artesian pump.dozer
|
|

Tank Seepage Test165 viewsThe underground tank was tested as to its water proof-ness. The water was allowed to set for 24 hours and no seepage was detected. dozer
|
|

Steel Specification165 viewsSteel is sold as light, medium, full or industrial (?¹‚?¸£?¸§?¹??¸«?¸??¹?) which is a confusing system. The actual specification which refers to the strength required to deform 1 mm strand is printed on the side of the rebar, in this case SD30, on this 12 mm rebar. Only the full grade was used on all 6, 9 and 12mm throughout the project.dozer
|
|

Electric in Attic164 viewsAnother view of the routing of electric wires in the attic area. Again the key her is a neat system of conduit which affixes securely to the joint boxes.dozer
|
|

Diagonal Checks for Column Placement162 viewsThe correct placement of columns is important to the overall project to ensure that the wall angles are as they should be and the house is as designed. Often the only tool used is an external measure + the use of a small square. This shows one additional check, taken from the 3 4 5 triangle rule. If you measure 3 meters along one axis and 4 meters along another axis the diagonal should be 5 meters (or in this case 6, 8 and 10). This is done in addition to measuring the diagonals for equality.dozer
|
|

162 viewsPower points with 4 grounded receptacles will be used throughout the house.
dozer
|
|

Initial Formwork for the Lid Pour161 viewsThis shows the initial formwork for the lid pour. The plywood is supported by 2" x 3" form work below. After the pour the form work will be removed.dozer
|
|
|

Ground Rod159 viewsThe copper ground rod + associated connector. The ground is 1.8 meters deep. Many projects do not use any or adequate ground rod. dozer
|
|

Bathrom Tiered Ceiling158 viewsNotice the vent windows and the upper exhaust vent in the top of the ceiling. The ceiling is tiered, with recessed lighting. dozer
|
|

Footing and Column Framework156 viewsThe footing frame and the column framework in place. Spacers are at the bottom and side. dozer
|
|