Plumbing Lines for Bathroom Sink190 viewsInbound and outbound water lines for the bathroom sink. dozer
|
|
Plumbing Lines for Bathroom Sink190 viewsThe inbound and outbound water pipes for the bathroom sink. The lines are mounted within the wall under a horizontal ring beam.dozer
|
|
Footing hole189 viewsThe footing hole and base framework on a poured concrete lip.
dozer
|
|
Plumbing Entry Exit187 viewsThis shot shows the 3 plumbing entry/exit areas within their designated over size cinder blocks (1 entry/exit in the forward kitchen, 2 in the bathroom). Also note the vent pipes which will run vertically up through the ceiling, will be tied together, and exit through the roof.
dozer
|
|
Flow Rate verification186 viewsThe guaranteed flow rate is 2000 liters per hour. Each canister has a volume of 200 liters, the flow was timed to compute the actual rate. The wells are guaranteed for a period of time and this company is good about servicing wells periodically.dozer
|
|
Water Septic #1186 viewsFirst dirty water septic tank for the bathroom. Five concrete rings of 1 m x 30 cm are surrounded with large gravel. The gravel layer is about 10 cm thick (all the way around the tank).
dozer
|
|
Power Point Box186 viewsThe power point box secured in place with cement.
dozer
|
|
Conduit Path185 viewsThe electrical conduit will run in the floor and also vertically in designated hollow cinder blocks.
dozer
|
|
Kitchen Drain Pipe183 viewsThe plumbing, like the electric, runs up a designated empty hole of an oversize cinder block. This one is the kitchen drain pipe.
dozer
|
|
Water Tank181 viewsNote the rebar that surrounds the tank and extends out of the walls. This was a part of the rebar meshing used to re enforce the structure. The interior cinderblock is formwork but will remain in the finished structure. It will be rendered with a waterproofing agent as was the cement in the walls of the tank. dozer
|
|
Lanko K10 waterproofing181 viewsAny roof not dry teched will need a waterproofing treatment at the ridges even after any visible imperfections are caulked. This house used this product over every section of ridge joint. dozer
|
|