happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section

Most viewed - Original Coolthaihouse Section
DSC04153.jpg
27 viewsThis electrical in the front on the left of the gate is used to split off the electrical to feed the perimeter wall lighting and the pumps.dozer
DSC05048.jpg
27 viewsBy using the wrong material to finish of the well, large pockets of air and water form - which put pressure on the sides of the well. Here is the well after the blocks were dug out. The footing will have the rebar supports at 2.5 meter intervals. dozer
DSC04116.jpg
27 viewsMid range expat house. (25-Jun-04)dozer
DSC03014.jpg
27 viewsThis shows and application using the heavy cement block. In this example it is being used to construct an underground water tank. (18-May-04)dozer
DSC01054.jpg
27 viewsWell Options: This is a pair of homemade water tanks. These are made from circular drainage fittings and cement. (17-Apr-04)dozer
DSC01077.jpg
27 viewsAn automatic pump of the type used for hand dug wells, this is a Fujika GF-225 automatic home pump. Good quality pumps run 5000 Baht or more. (19-Apr-04)dozer
DSC02015.jpg
27 viewsThis is a large tower which services several small apartments and is more than what would be needed for a residential house, but it gives you an idea. The base of this one is 2.70 meters square. The height is about 5 meters and water capacity of about 2000 liters. (27-Apr-04)dozer
DSC05126~1.jpg
27 viewsThe units in this example are housed on a cement slab and enclosed in am lockable metal enclosure. (19-Aug-04)dozer
DSC05132~0.jpg
27 viewsHere is the corrected well finished off with a cement base. (19-Aug-04)dozer
DSC05080~0.jpg
27 viewsAdded the final gutter on top of the patio. (23-Jun-04)dozer
DSC02023.jpg
26 viewsThis shows the patch done on the inside of the roof valley but it is a little hard to see. Basically instead of one piece of aluminum an additional piece was added on top which sets on top of the 1 * 1 cross supports. The whole idea here is to add more angle and prevent any water entry during a rainy storm with high winds. (29-Apr-04)dozer
DSC00153.jpg
26 viewsAn embedded anchor nail. These nails are put in the door frame at regular intervals (about 15 centimeters apart) and used to anchor the frame to the wall.dozer
749 files on 63 page(s) 9

Debug Info 
Debug Output: show / hide