Most viewed - Original Coolthaihouse Section |
28 viewsFiltration: The canisters are housed in a lockable metal cage. (19-Aug-04)dozer
|
|
28 viewsDeep Water Well: A rig at work drilling a deep water well. (03-Apr-04)dozer
|
|
28 viewsWhen water is reached a pump is utilized so that digging can continue down another 1 or 2 meters until the water is sufficient to use all year around. (29-May-04)dozer
|
|
28 viewsHere is a water tank with no tower, which is how I did it in the cool thai house. The downside to not having a tower is that an extra pump is needed to drive water into the house. (02-Jul-04)dozer
|
|
27 viewsThe roof structure is built using heavy gauge steel. The bigger pieces are 4 * 2 inches 3.2 mm thick. The smaller pieces are 1 by 1inch 1.6 mm thick. There are two designations, full and light, this is the full heavier gauge variety. (13-Mar-04) dozer
|
|
27 viewsTwo windows framed. There is a 'leveled' cement base below the window frame and bricks are being used to level the wall to be even with the top of the frame. (13-Mar-04)dozer
|
|
27 viewsThe wood windows after a couple of coats of varnish. (27-Jun-04)dozer
|
|
27 viewsScreens and metal security grates being installed. (08-Jul-04)dozer
|
|
27 viewsStucco is what gives strength to the wall. Notice the thickness of the stucco shown here. This is the front exterior wall. (17-Apr-04)dozer
|
|
27 viewsKitchen floor tile. (26-May-04)dozer
|
|
27 viewsHere is a cement ring is being put in place in one of the septics. (23-Apr-04)dozer
|
|
27 viewsConcrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozer
|
|
749 files on 63 page(s) |
|
|
|
|
|
8 | |
|
|
|
|
|
|
|