|
Most viewed - Original Coolthaihouse Section |
8 viewsPour in a room in progress.dozer
|
|
8 viewsMetal is used to add strength to the floor. The metal that comes in rolls is cheaper but is not very good and should be avoided if possible.dozer
|
|
8 viewsAfter the floor is poured a level layer of cement is leveled in a row and tiles are placed on top of it and tapped into place. (13-May-04)dozer
|
|
8 viewsEach tile is carefully tapped into place. (14-May-04)dozer
|
|
8 viewsHere the next tile is set in place. dozer
|
|
8 viewsThe grc sheeting is applied in sections like this. A decorative wood strip is applied as a separator on top of the grc sheeting. (03-May-04)dozer
|
|
8 viewsA completed and painted section in the rear of the house. (08-Jul-04)dozer
|
|
7 viewsThe grc sheeting is applied in sections like this. Separating the grc sheeting is a decorative wood strip. (03-May-04)dozer
|
|
7 viewsA completed and painted section in the rear of the house. (08-Jul-04)dozer
|
|
7 viewsThe pour in progress in the front bedroom.dozer
|
|
7 viewsTo prepare for the pour 2 hun metal is hand tied into a mesh pattern. (20-Apr-04)dozer
|
|
7 viewsAfter the cement is dry, tile grout is applied. The grouts come in various colors to match the shade of the tile. (24-May-04)dozer
|
|
749 files on 63 page(s) |
|
|
|
|
|
|
|
|
|
62 |
|
|
|
|