9 viewsThe entry road has been getting bad for quite some time now until it is like this! Passing is now impossible except with a 4 wheel drive. (22-May-04)dozer
|
|
9 viewsBuilding the wood framework. (24-Apr-04)dozer
|
|
9 viewsA partially enclosed section on the back part of the house.dozer
|
|
9 viewsThe wood framework above the parking area. (11-May-04)dozer
|
|
9 viewsDecorative wood trim is applied around the foundation posts. (12-May-04)dozer
|
|
9 viewsThe partially completed section over the parking spot. (21-May-04)dozer
|
|
9 viewsThe standard high quality brand of cement used, tiger green (suua).dozer
|
|
9 viewsA typical mixing vat. (21-Apr-04)dozer
|
|
9 viewsA stick is used to designate the height of the pour. Here we used a height of 7 centimeters for the pour (allowing 3 centimeter for the tile).dozer
|
|
9 viewsA square mesh pattern is created above the sand sub-flooring.dozer
|
|
9 viewsThe still wet surface is 'roughed' with a broom in preparation for tiling. (20-Apr-04)dozer
|
|
9 viewsPour close up. (21-Apr-04)dozer
|
|