|
Most viewed - Original Coolthaihouse Section |
13 viewsEach tile is carefully tapped into place. (14-May-04)dozer
|
|
13 viewsI wanted to contrast the previous road to what everyone would really like to see. This land is subdivided and a concrete entry road has been poured to a 20 centimeter depth. There is also associated drainage and the electric is already setup, all prior to any building started. Now, the downside. This land, which is in the same area as the cool thai house plot, is 2 1/2 times more expensive, and the minimum lot size is 1 rai (at 2.5 million Baht)! So, you can find perfection but you must pay the price! (29-Jul-04)dozer
|
|
13 viewsAnd it attaches to the support metal framework like this. (06-May-04)dozer
|
|
13 viewsChecking the frame. (07-May-04)dozer
|
|
13 viewsThe counter will be supported by red brick columns. (13-May-04)dozer
|
|
13 viewsMetal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall and the metal inserted.dozer
|
|
13 viewsPost holes like this are dug each 2.5 meters. The stick at the bottom signifies the center of the fence post to be poured. The hole is 60 cm square, 60 cm deep. (11-Jan-04) dozer
|
|
13 viewsAnother view of the back wall. dozer
|
|
13 viewsThe gate track is laid in position. (15-Jul-04)dozer
|
|
13 viewsShaping the driveway. (27-Jun-04)dozer
|
|
13 viewsTile roof example. (13-Aug-04)dozer
|
|
13 viewsThe roof tile is wired on to hold it in place. Notice the tile sits in place on the 1 * 1 metal cross beam. (22-Mar-04) dozer
|
|
749 files on 63 page(s) |
|
|
|
|
|
48 | |
|
|
|
|
|
|
|