DSC02117.jpg
14 viewsHere is the front bedroom partially tiled. dozer
DSC03084~0.JPG
14 viewsHere I'm just wondering how much worse can the road actually get before someone does something. (31-May-04)dozer
DSC04005.jpg
14 viewsCeiling after taping complete.dozer
DSC02116.jpg
14 viewsPartially finished counter with supporting brick columns.dozer
DSC02137~0.jpg
14 viewsEach cabinet section has a wood door. dozer
DSC02146.jpg
14 viewsThis shows a relatively think layer of stucco is applied.dozer
DSC02152.jpg
14 viewsThis shows the rough finish on the stucco and the tiles being applied. Cement unmixed with sand is used as the affixing agent. (15-May-04)dozer
DSC00023.jpg
14 viewsThe base is cemented in place with a cement pour around 30 cm thick. dozer
DSC00032.jpg
14 viewsThe footing will have the rebar supports at 2.5 meter intervals. dozer
DSC00035.jpg
14 viewsAnother shot of the blocks. Note, there is a vertical piece of rebar put in place between the blocks close to the post for every block. This metal piece is used to add strength. It is guage 2 hun full and is about 40 cm long.dozer
DSC00039.jpg
14 viewsThe support post is poured around the adjacent blocks using a form structure. dozer
DSC05094.jpg
14 viewsRoller mechanism for the gate. There is one metal roller on the outside and one on the inside of the upside down 'U' piece of metal. (29-Jul-04)dozer