|

Most viewed - Original Coolthaihouse Section |

15 viewsThe counter after the cement pour. (27-Apr-04)dozer
|
|

15 viewsThis is the entry way for the walk in gate. dozer
|
|

15 viewsIn the gate is composed of 1 1/2 " square metal frame and vertical 1" square metal bars. The inside circular decorations were bought pre-finished, we use a butterfly and flower design. dozer
|
|

15 viewsFitting the gate in place. The metals are painted with a primer first and then painted with a quality oak shade of paint. (23-Jul-04)dozer
|
|

15 viewsFitting a wall piece in place. (26-Jul-04)dozer
|
|

15 viewsMetal fencing section. (15-Aug-04)dozer
|
|

15 viewsMetal entry door. (22-Aug-04)dozer
|
|

15 viewsThe row of bricks is attached to the wall with strips of rebar for strength. (24-Jun-04)dozer
|
|

15 viewsNearly completed planter box on the front right of the patio.dozer
|
|

15 viewsThe foundation posts are finished off by having decorative corners added. (19-Apr-04)dozer
|
|

15 viewsAnother example of a house in progress with a synthetic roof. (20-Jul-04)dozer
|
|

15 viewsA wood framed door. Notice the concrete strip which runs above the frame. (22-Mar-04)dozer
|
|
749 files on 63 page(s) |
 |
 |
 |
 |
 |
42 |  |
 |
 |
 |
|

|
|
|