|
Most viewed - Original Coolthaihouse Section |
16 viewsSome Other Shots: A track formed from a two sided piece of metal laid in the ground with the ridge side up. It is cemented in place. (15-Jul-04)dozer
|
|
16 viewsInstalling brackets for the 6" gutter sections. (16-Jun-04)dozer
|
|
15 viewsGreat room nearly complete.dozer
|
|
15 viewsA smoothing tool is used to correctly level and slope the patio. (03-Jun-04)dozer
|
|
15 viewsFinished roof, view from rear.dozer
|
|
15 viewsTo the left of my truck is the building plot. My truck is on the dirt entry road. Looks good enough here doesn't it. (01-Jan-04)dozer
|
|
15 viewsA current shot of the fixed road with the cool thai house at the end on the left. The dirt used is a dirt and small stone mix which is used mainly for roads. It gets real hard and will not turn to mud when water sits on it. One last thing which needs to eventually done with the road is to shape it as rounded, which can't be done as long as the aluminum fence is run along the far right side of the road. (18-Jun-04)dozer
|
|
15 viewsElectric conduit will lay on top of the metal support structure. (18-May-04)dozer
|
|
15 viewsTaping the sheetrock seams. (07-Jun-04)dozer
|
|
15 viewsThe counter after the cement pour. (27-Apr-04)dozer
|
|
15 viewsThis is the entry way for the walk in gate. dozer
|
|
15 viewsIn the gate is composed of 1 1/2 " square metal frame and vertical 1" square metal bars. The inside circular decorations were bought pre-finished, we use a butterfly and flower design. dozer
|
|
749 files on 63 page(s) |
|
|
|
|
|
41 | |
|
|
|
|
|
|
|