|
Most viewed - Original Coolthaihouse Section |
16 viewsExample of a house with wood windows. (19-Apr-04)dozer
|
|
16 viewsThis shows the opening mechanism for a top and bottom hinge window as opposed to a window with hinges mounted on the outside. Notice also the screen, security metal and push rod opener. (23-Aug-04)dozer
|
|
16 viewsTaping the sheetrock seams. (07-Jun-04)dozer
|
|
16 viewsSample Kitchen #1: The metal for the kitchen counter is secured on top of some grc sheets and drilled into the wall prior to pouring cement. (26-Apr-04)dozer
|
|
16 viewsElectric meter after installation. The prep work must be done by an electrician and then the electric department will come and check it. If it is OK they will hook up the meter. (21-Aug-04)dozer
|
|
16 viewsSupporting rebar structures, which are made by tying metal strands together, are placed in the completed post hole. There is a metal base on the bottom of the structure. The metal used on the upright pieces is guage 3 hun full, the square supports are 2 hun full. dozer
|
|
16 viewsCement is poured using a large metal can as a form, about 30 cm square. (13-Jan-04) dozer
|
|
16 viewsAnother shot showing the strip footing with the rebar supports at 2.5 meter intervals. dozer
|
|
16 viewsAnother view of the back wall. dozer
|
|
16 viewsThis application was finished off with two main entry posts and an entry gate. A layer of bricks was used on top of these prefabricated entry posts for an artistic look. (06-Jul-04).dozer
|
|
16 viewsStainless gate. (24-Jun-04)dozer
|
|
16 viewsStainless security section.dozer
|
|
749 files on 63 page(s) |
|
|
|
|
|
40 | |
|
|
|
|
|
|
|