DSC05158.jpg
16 viewsThe wall exhaust fan looks like this. It is wired to a separate switch on the right hand side of the sink. (24-Aug-04)dozer
DSC04111~0.jpg
16 viewsBathtub in the process of being framed. The bathtub is being sized here. After this two more rows of supporting bricks were added, for a total of 4 supporting rows. (25-Jun-04)dozer
DSC00160.jpg
16 viewsThe PVC is then cemented in place.dozer
DSC02104.jpg
16 viewsOpening being made for the circuit breaker. (12-May-04)dozer
DSC00034.jpg
16 viewsTo add strength the blocks are cemented in place prior to pouring the supporting posts. The posts will be poured 'around' the blocks. Standard sizes for facing walls is 4 blocks high, the back sides are 7 blocks high. (24-Jan-04) dozer
DSC00040~0.jpg
16 viewsA wall section (front and side) with completed support post structures. dozer
DSC05072.jpg
16 viewsMetal being cut at the same time it is welded by another worker.dozer
DSC05030.jpg
16 viewsLaying a row of bricks. (08-Jul-04)dozer
DSC05040.jpg
16 viewsThe planter box which runs adjacent to the driveway. Notice the decorative cement finishing trim added on top. (09-Jul-04)dozer
DSC05151~0.jpg
16 viewsView of planter boxes from patio. (22-Aug-04)dozer
DSC05104.jpg
16 viewsThe paving stones are set in place.dozer
DSC00067~0.jpg
16 viewsThe metal support structures for the house use metal of guage 4 hun full with the cross supports 3 hun full. They are temporarily held upright by a wood support. (29-Feb-04)dozer