16 viewsThe wall exhaust fan looks like this. It is wired to a separate switch on the right hand side of the sink. (24-Aug-04)dozer
|
|

16 viewsBathtub in the process of being framed. The bathtub is being sized here. After this two more rows of supporting bricks were added, for a total of 4 supporting rows. (25-Jun-04)dozer
|
|

16 viewsThe PVC is then cemented in place.dozer
|
|

16 viewsOpening being made for the circuit breaker. (12-May-04)dozer
|
|

16 viewsTo add strength the blocks are cemented in place prior to pouring the supporting posts. The posts will be poured 'around' the blocks. Standard sizes for facing walls is 4 blocks high, the back sides are 7 blocks high. (24-Jan-04) dozer
|
|

16 viewsA wall section (front and side) with completed support post structures. dozer
|
|

16 viewsMetal being cut at the same time it is welded by another worker.dozer
|
|

16 viewsLaying a row of bricks. (08-Jul-04)dozer
|
|

16 viewsThe planter box which runs adjacent to the driveway. Notice the decorative cement finishing trim added on top. (09-Jul-04)dozer
|
|

16 viewsView of planter boxes from patio. (22-Aug-04)dozer
|
|

16 viewsThe paving stones are set in place.dozer
|
|

16 viewsThe metal support structures for the house use metal of guage 4 hun full with the cross supports 3 hun full. They are temporarily held upright by a wood support. (29-Feb-04)dozer
|
|