16 viewsThe PVC is then cemented in place.dozer
|
|
16 viewsOpening being made for the circuit breaker. (12-May-04)dozer
|
|
16 viewsTo add strength the blocks are cemented in place prior to pouring the supporting posts. The posts will be poured 'around' the blocks. Standard sizes for facing walls is 4 blocks high, the back sides are 7 blocks high. (24-Jan-04) dozer
|
|
16 viewsA wall section (front and side) with completed support post structures. dozer
|
|
16 viewsMetal being cut at the same time it is welded by another worker.dozer
|
|
16 viewsLaying a row of bricks. (08-Jul-04)dozer
|
|
16 viewsThe planter box which runs adjacent to the driveway. Notice the decorative cement finishing trim added on top. (09-Jul-04)dozer
|
|
16 viewsView of planter boxes from patio. (22-Aug-04)dozer
|
|
16 viewsThe paving stones are set in place.dozer
|
|
16 viewsThe cross supports are held in place by wire strands.dozer
|
|
16 viewsForm wood is wedged in place over the square upright rebar frames and then the concrete is poured in. The foundation columns should have a width of about 20 centimeters square. (24-Apr-04)dozer
|
|
16 viewsClose up of synthetic roof sheeting material on the roof.dozer
|
|