|
Most viewed - Original Coolthaihouse Section |
16 viewsThis shows most of the foundation columns as well as the partially finished roof truss. The roof height is 2.75 meters about the foundation pillars, the foundation pillars are 3.50 meters to the overall height is 6.25 meters. Being up on the roof truss is like mountain climbing.dozer
|
|
16 viewsPartially finished roof truss, rear side of house. dozer
|
|
16 viewsThis shot also shows the facia board (brand facolia, a synthetic material) along with an aluminum preformed strip for rain water. This drainage strip is inadequate in size and leads to problems later. It has a width of about 20 centimeters. (22-Mar-04) dozer
|
|
16 viewsMore roof sections. This shot shows the covered parking area, and entryway areas. (22-Mar-04)dozer
|
|
16 viewsRepaired roof valley. dozer
|
|
16 viewsThis is the final fix to the valley on the right side of the house. Added flashing material is being added. (30-Jun-04)dozer
|
|
16 viewsThis shows the frame after stucco has been partially applied. (17-Apr-04)dozer
|
|
16 viewsNails are used on the outside of the cabinet to anchor to the surrounding wall. dozer
|
|
16 viewsHere stucco has been affixed.dozer
|
|
16 viewsThis shows the opening formed for the exhaust fan. The opening is framed made from a wood frame cemented in place in the wall. The fan fits in place and can be slid out for cleaning. (18-May-04)dozer
|
|
16 viewsThe wall exhaust fan looks like this. It is wired to a separate switch on the right hand side of the sink. (24-Aug-04)dozer
|
|
16 viewsBathtub in the process of being framed. The bathtub is being sized here. After this two more rows of supporting bricks were added, for a total of 4 supporting rows. (25-Jun-04)dozer
|
|
749 files on 63 page(s) |
|
|
|
|
|
38 | |
|
|
|
|
|
|
|