DSC04049~0.jpg
17 viewsA window cutter will measure and cut the wood windows on site. (19-Jun-04)dozer
DSC04164.jpg
17 viewsThey measure and cut it on-site and then install it. After installation they will caulk each window opening. Window installation in a 100 square meter house will cost about 3500 Baht. The window glass can be ordered in various tints.dozer
DSC05134~1.jpg
17 viewsAn example of a front wood entry door. (19-Aug-04)dozer
DSC05135~0.jpg
17 viewsAn example of wood windows with a top and bottom type hinge set.dozer
DSC04005~0.jpg
17 viewsA roof after the taping is complete.

dozer
DSC03102~0.jpg
17 viewsThis shows the simplicity of the plumbing. Each bathroom is serviced by two septics, one for solid waste and one for water runoff. Normally there will be three runoff pipe per bathroom as follows; shower, sink and a runoff for the floor drain. The pipes are run into the septic and then cemented in place. (01-Jun-04)dozer
DSC03110~0.jpg
17 viewsSink plumbing. This sink is fed by 1/2 inch hot and cold pipes coming in and there is a drainage exhaust going out. The pvc pipes will later be cemented into the wall. dozer
DSC04001.jpg
17 viewsThis shot shows a cement pour in progress which will encase the hot and cold water plumbing in cement. Also, the septics will be covered in concrete with a 4" PVC pipe for venting.dozer
DSC05035~0.jpg
17 viewsPreparation for a septic cover. (08-Jul-04)dozer
DSC05050~0.jpg
17 viewsWith a new housing development, outside electric will need to be run into the development by the electric department, as in this example. This road was given to the county, ie. it is now a public road, but the installation must still be paid by private funds. In this example, the cost for the project (for the entire street) was 35,000 Baht. (12-Jul-04)dozer
DSC00023~0.jpg
17 viewsThe base is cemented in place with a cement pour around 30 cm thick. dozer
DSC00034~0.jpg
17 viewsTo add strength the blocks are cemented in place prior to pouring the supporting posts. The posts will be poured 'around' the blocks. Standard sizes for facing walls is 4 blocks high, the back sides are 7 blocks high. (24-Jan-04) dozer