|

Most viewed - Original Coolthaihouse Section |

17 viewsHere is the door lock in the process of being corrected.dozer
|
|

17 viewsHobbyist flying close to rooftop level. (19-Jun-04)dozer
|
|

17 viewsPouring cement to form the counter.dozer
|
|

17 viewsFloor tiles. (26-May-04)dozer
|
|

17 viewsAffixing grout to the kitchen floor tiles. (27-May-04)dozer
|
|

17 viewsAffixing grout to the tiles on the inside of the cabinets. (19-Jun-04)dozer
|
|

17 viewsA small outlet box being set in place. (02-Apr-04)dozer
|
|

17 viewsA recessed lighting hole. The electrical wires which are housed in PVC conduit.dozer
|
|

17 viewsThere is always a trio of wire, red is positive, white is negative and green is the ground.dozer
|
|

17 viewsAnd reset again. Notice now how the tabs are on the left and right side.dozer
|
|

17 viewsThe electric department hooking up electrical for the street. (12-Jul-04)dozer
|
|

17 viewsAnother shot showing the footing with the rebar supports at 2.5 meter intervals. dozer
|
|
749 files on 63 page(s) |
 |
 |
 |
 |
 |
34 |  |
 |
 |
 |
|

|
|
|