|
Most viewed - Original Coolthaihouse Section |
17 viewsPouring cement to form the counter.dozer
|
|
17 viewsFloor tiles. (26-May-04)dozer
|
|
17 viewsAffixing grout to the kitchen floor tiles. (27-May-04)dozer
|
|
17 viewsAffixing grout to the tiles on the inside of the cabinets. (19-Jun-04)dozer
|
|
17 viewsA small outlet box being set in place. (02-Apr-04)dozer
|
|
17 viewsA recessed lighting hole. The electrical wires which are housed in PVC conduit.dozer
|
|
17 viewsThere is always a trio of wire, red is positive, white is negative and green is the ground.dozer
|
|
17 viewsAnd reset again. Notice now how the tabs are on the left and right side.dozer
|
|
17 viewsThe electric department hooking up electrical for the street. (12-Jul-04)dozer
|
|
17 viewsAnother shot showing the footing with the rebar supports at 2.5 meter intervals. dozer
|
|
17 viewsLaying a brick in place.dozer
|
|
17 viewsFinishing touches applied to the top of the perimeter wall foundation post.dozer
|
|
749 files on 63 page(s) |
|
|
|
|
|
34 | |
|
|
|
|
|
|
|