Most viewed - Original Coolthaihouse Section |
18 viewsThe strip footing will have the rebar supports at 2.5 meter intervals. dozer
|
|
18 viewsAnother shot of the blocks. Note, there is a piece of rebar placed horizontally in the post then laid on top of the adjacent row of blocks. This metal piece is used to add strength. It is guage 2 hun full and is about 40 cm long. dozer
|
|
18 viewsThis is another material which can be used in combination with the entry posts. Here the posts are surrounded with a large decorative brick. (06-26-04)dozer
|
|
18 viewsHere is a heavy duty but simple design on a regular metal walk in entry with the gate to the left. (26-Jun-04)dozer
|
|
18 viewsA completed gutter section. (18-Jun-04)dozer
|
|
17 viewsPartially finished roofing on the front entry side of the house. (28-Mar-04) dozer
|
|
17 viewsSide of house. dozer
|
|
17 viewsFinished roof, view from right front.dozer
|
|
17 viewsFinished roof, view from right front.dozer
|
|
17 viewsHere is the door lock in the process of being corrected.dozer
|
|
17 viewsHobbyist flying close to rooftop level. (19-Jun-04)dozer
|
|
17 viewsFinally, the road is what I would call fixed! One cardinal lesson for all who build houses is never skimp on fill dirt, one thing which can't be fixed is a house below street level. Note the level of the house on the left is about 60 cm. or more below street level. (12-Jun-04)dozer
|
|