DSC00140.jpg
18 viewsSample Kitchen #2: Simple kitchen design in a small house. (28-Mar-04)dozer
DSC04100~0.jpg
18 viewsA critical piece of hardware which should be installed under the bathtub. It prevents foul odors from entering through the drainpipe. A plumber may or may not suggest using one, therefore you might want to buy one and request that he install it. (24-Jun-04)dozer
DSC06010~0.jpg
18 viewsAn eight station circuit breaker. The main switch is required to be 45 amp by the city electric department. (09-Sep-04)dozer
DSC00032~0.jpg
18 viewsThe strip footing will have the rebar supports at 2.5 meter intervals. dozer
DSC00035~0.jpg
18 viewsAnother shot of the blocks. Note, there is a piece of rebar placed horizontally in the post then laid on top of the adjacent row of blocks. This metal piece is used to add strength. It is guage 2 hun full and is about 40 cm long. dozer
DSC04121~0.jpg
18 viewsThis is another material which can be used in combination with the entry posts. Here the posts are surrounded with a large decorative brick. (06-26-04)dozer
DSC04121.jpg
18 viewsHere is a heavy duty but simple design on a regular metal walk in entry with the gate to the left. (26-Jun-04)dozer
DSC05036~0.jpg
18 viewsA completed gutter section. (18-Jun-04)dozer
DSC00130.jpg
17 viewsPartially finished roofing on the front entry side of the house. (28-Mar-04) dozer
DSC00132~0.jpg
17 viewsSide of house. dozer
DSC05119~0.jpg
17 viewsFinished roof, view from right front.dozer
DSC05120~0.jpg
17 viewsFinished roof, view from right front.dozer
749 files on 63 page(s) 33