DSC05160.JPG
18 viewsUpdate 16-Aug-04: The shape of the road is now really bad, as it is U shaped. The water cannot run off, but puddles in some spots in and around the middle of the road.dozer
DSC02160.jpg
18 viewsThe cement surface of the cabinets is rough finished to allow the tiles to affix easily. dozer
DSC03025.jpg
18 viewsA bit of repair in process. The tile on the front of the cabinet was not even with the door, so the tiles are being removed. More cement will be added to adjust the level. (21-May-04)dozer
DSC04021~0.jpg
18 viewsThe plumber is applying tile grout. (14-Jun-04)dozer
DSC04063.jpg
18 viewsThe bathtub will be supported by this brick enclosure.dozer
DSC04073.jpg
18 viewsPartially tiled sink enclosure in the small bathroom. (22-Jun-04)dozer
DSC02161.jpg
18 viewsThe electrician expounding on all things electrical. (18-May-04)dozer
DSC03068.jpg
18 viewsSo they need to get chipped out.dozer
DSC04151.jpg
18 viewsSetting up a switch box for the two water pumps on the outside wall. (29-Jun-04)dozer
DSC04142.jpg
18 viewsStucco being applied to the perimeter wall.dozer
DSC05018.jpg
18 viewsFinished wall section with some decorative brickwork on the entry posts. (06-Jul-04)dozer
DSC05121~0.jpg
18 viewsThe rear gutter and down spout.(13-Aug-04)dozer