|
Most viewed - Original Coolthaihouse Section |
18 viewsA bit of repair in process. The tile on the front of the cabinet was not even with the door, so the tiles are being removed. More cement will be added to adjust the level. (21-May-04)dozer
|
|
18 viewsThe plumber is applying tile grout. (14-Jun-04)dozer
|
|
18 viewsThe bathtub will be supported by this brick enclosure.dozer
|
|
18 viewsPartially tiled sink enclosure in the small bathroom. (22-Jun-04)dozer
|
|
18 viewsThe electrician expounding on all things electrical. (18-May-04)dozer
|
|
18 viewsSo they need to get chipped out.dozer
|
|
18 viewsSetting up a switch box for the two water pumps on the outside wall. (29-Jun-04)dozer
|
|
18 viewsStucco being applied to the perimeter wall.dozer
|
|
18 viewsFinished wall section with some decorative brickwork on the entry posts. (06-Jul-04)dozer
|
|
18 viewsThe rear gutter and down spout.(13-Aug-04)dozer
|
|
18 viewsThe resulting paving stone walkway. (12-Aug-04)dozer
|
|
18 viewsClose up of small red brick construction.dozer
|
|
749 files on 63 page(s) |
|
|
|
|
|
31 | |
|
|
|
|
|
|
|