|
Most viewed - Original Coolthaihouse Section |
19 viewsYou can see from a close examination of this wall section that the post was not correctly poured around the blocks. (14-Jul-04) dozer
|
|
19 viewsRoller mechanism for the gate. There is one metal roller on the outside and one on the inside of the upside down 'U' piece of metal. Metal rollers, even though subject to rust, are better than the plastic ones which wear out quickly. (29-Jul-04)dozer
|
|
18 viewsPour in progress in the front bedroom.dozer
|
|
18 viewsTo prepare for the pour metal rebar (gauge 2 hun) is hand tied into a mesh pattern. (20-Apr-04)dozer
|
|
18 viewsPour in the great room in progress.dozer
|
|
18 viewsStucco applied to the front of the house. (19-Apr-04)dozer
|
|
18 viewsNearly finished roof section in rear of house. dozer
|
|
18 viewsFront valley looks pretty poor after the first try. This will need to be reworked since the tiles do not come together in a nice clean straight cut line. dozer
|
|
18 viewsClose up of valley problem area. dozer
|
|
18 viewsBathroom door being framed. This was a repair job. dozer
|
|
18 viewsUpdate 16-Aug-04: The shape of the road is now really bad, as it is U shaped. The water cannot run off, but puddles in some spots in and around the middle of the road.dozer
|
|
18 viewsThe cement surface of the cabinets is rough finished to allow the tiles to affix easily. dozer
|
|
749 files on 63 page(s) |
|
|
|
|
|
30 | |
|
|
|
|
|
|
|