19 viewsThe entry switch box with 6 groups of wires. On the left is the electrical for a fan. (23-May-04)dozer
DSC04035~1.jpg
19 viewsThe electrical systems feeds the 35 down lights and 5 fans hooked on the ceiling. (18-Jun-04)dozer
DSC04048.jpg
19 viewsPreparing the circuit breaker. (19-Jun-04)dozer
DSC05119~1.jpg
19 viewsThe gate and metal fencing in place. (13-Aug-04)dozer
DSC05163.jpg
19 viewsThe gate wheels are very important. There are two sets of heavy duty 3" stainless steel wheels. (27-Aug-04)dozer
DSC06001.jpg
19 viewsThe gate anchor.dozer
DSC05036.jpg
19 viewsA completed gutter section.dozer
DSC01013.jpg
19 viewsA house being constructed from small red bricks.dozer
DSC00072~0.jpg
19 viewsThe base rebar (4 hun full) is placed on top of a gravel sub footing. The stick represents the middle of the foundation post which is to be poured.dozer
DSC00074~0.jpg
19 viewsThe foundation post holes should be around 1 meter square and 1 meter deep. dozer
DSC01012.jpg
19 viewsHere is a house with aluminum windows which uses a wood entry door. (03-Apr-04)dozer
DSC05001.jpg
19 viewsThe problem with doing septics this way is that the materials will cross flow between septics. Also the dirt pack will be tighter if each hole is dug individually.dozer