happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section

Most viewed - Original Coolthaihouse Section
DSC00116.jpg
20 viewsStarting to frame a bedroom door. A piece of 2 * 4 is used to keep the door in place.dozer
DSC05095.jpg
20 viewsCurtain installation. (29-Jul-04)dozer
DSC03160.jpg
20 viewsThe house is situated very close to a flying club. Most evenings hobbyists are out flying their engine powered parachute crafts. (05-Jun-04)dozer
DSC04040.JPG
20 viewsAnother shot of the tragic 'too low' house. This is the entry after 10 minutes of rain, it is a lake. The developer wants to lower the entire road which would just make everyone have a problem, will be interesting to see how it 'washes out'. Will keep updates posted here.dozer
DSC05159.JPG
20 viewsUpdate 16-Aug-04: Had the end of the road blocked off with old coconut stumps. (24-Aug-04)dozer
DSC06006.JPG
20 viewsUpdate 02-Sep-04: Here is a puddle further up the road.dozer
DSC02109.jpg
20 viewsThis shows the sheetrock roof in the main house area with prep holes for the down lights. (12-May-04)dozer
DSC03049.jpg
20 viewsThe kitchen tile expert selecting tiles. (24-May-04)dozer
DSC03166~0.jpg
20 viewsConcrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozer
DSC04043.jpg
20 viewsThis shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozer
DSC04107.jpg
20 viewsHeavy duty drainage assembly being attached to the bathtub. Note; this is a heavy duty acrylic bathtub.dozer
DSC05035.jpg
20 viewsPrep work for the septic exhaust cover. (08-Jul-04dozer
749 files on 63 page(s) 24

Debug Info 
Debug Output: show / hide