DSC01043.jpg
21 viewsThe well rings which are inserted in the finished well come in various diameters, the ones used here are 1.2 meters. dozer
DSC05125~1.jpg
21 viewsThe front gutter system. (15-Aug-04)dozer
DSC01020.jpg
21 viewsMid range house built for a foreign owner. (03-Apr-04)dozer
DSC05039.jpg
21 viewsA more classic Thai architecture from teak wood. (09-Jul-04)dozer
DSC05142.jpg
21 viewsHere is an aluminum window with a cement preformed border frame (which in this shot hasn't been painted yet). These frames are an attractive addition to aluminum windows. (20-Aug-04)dozer
DSC00008~0.jpg
21 viewsVARIOUS OPTIONS: This shot shows a nice application of a diagonal section which can be used to make entry easier. The diagonal section can be added at each side of the entry gate. (01-Jan-04)dozer
DSC05022.jpg
21 viewsWALL EXAMINATION: A good enough looking wall section but can you notice two things? The posts are far apart (3.5 meters) and the fact that you can see the imprint of the underlying blocks indicates that the stucco layer applied was very thin. (06-Jul-04)dozer
DSC05130.jpg
21 viewsA conventional floater water valve. Using this type of valve (much like a toilet valve), the pump will open almost after each use. (19-Aug-04)dozer
DSC05102~1.jpg
21 viewsAs far as painting, normally there is a primer coat used and then after that the regular color on top. For detail work gold leaf paint is often used. A yellow primer is first applied and then the gold on top of that. There is a good quality paint imported (from Italy) which is widely used. (31-Jul-04)dozer
DSC01101.jpg
20 viewsA tile mesh pattern is created above the sand flooring.dozer
DSC02018.jpg
20 viewsWorking on the front roof valley of the house. (28-Apr-04)dozer
DSC02030.jpg
20 viewsFront valley being completed. (30-Apr-04) dozer