happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section

Most viewed - Original Coolthaihouse Section
DSC02118.jpg
21 viewsFrom the back of the house. (13-May-04)dozer
DSC02119.jpg
21 viewsAnother shot from the back of the house.dozer
DSC00075.jpg
21 viewsThe footing of a foundation column. (29-Feb-04)dozer
DSC00100.jpg
21 viewsThe roof structure is built using heavy guage steel. The bigger pieces are 4 *2 inches and 1.6 mm thick. The smaller pieces are 1 by 1 inch and 1.6 mm thick. The roof tile will lie on the 1 by 1's, so they must be placed at the proper interval. Notice the cross beam supports which sit on top of the foundation posts. (13-Mar-04)dozer
DSC04011.jpg
21 viewsLarge bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozer
DSC04054.jpg
21 viewsThe sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozer
DSC04062.jpg
21 viewsThe large bathroom cabinet. dozer
DSC04129.jpg
21 viewsBathtub tiled in. (27-Jun-04)dozer
DSC05015.jpg
21 viewsSmall bathroom sink.dozer
DSC05038.jpg
21 viewsStainless septic exhaust cover installed. (09-Jul-04)dozer
DSC00114.jpg
21 viewsPVC conduit is run up the wall to house the electrical. (22-Mar-04)dozer
DSC05122.jpg
21 viewsPainted and finished wall section with decorative metal. (15-Aug-04)dozer
749 files on 63 page(s) 22

Debug Info 
Debug Output: show / hide