Most viewed - Original Coolthaihouse Section |
21 viewsFrom the back of the house. (13-May-04)dozer
|
|
21 viewsAnother shot from the back of the house.dozer
|
|
21 viewsThe footing of a foundation column. (29-Feb-04)dozer
|
|
21 viewsThe roof structure is built using heavy guage steel. The bigger pieces are 4 *2 inches and 1.6 mm thick. The smaller pieces are 1 by 1 inch and 1.6 mm thick. The roof tile will lie on the 1 by 1's, so they must be placed at the proper interval. Notice the cross beam supports which sit on top of the foundation posts. (13-Mar-04)dozer
|
|
21 viewsLarge bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozer
|
|
21 viewsThe sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozer
|
|
21 viewsThe large bathroom cabinet. dozer
|
|
21 viewsBathtub tiled in. (27-Jun-04)dozer
|
|
21 viewsSmall bathroom sink.dozer
|
|
21 viewsStainless septic exhaust cover installed. (09-Jul-04)dozer
|
|
21 viewsPVC conduit is run up the wall to house the electrical. (22-Mar-04)dozer
|
|
21 viewsPainted and finished wall section with decorative metal. (15-Aug-04)dozer
|
|