23 viewsThe perimeter wall is mostly completed. Still needs to be stuccoed. (27-Jan-04)dozer
|
|
23 viewsThis shows the rear door being framed. This is a repair job, since on the first attempt anchor nails were not used. This time nails will be placed at 4" intervals to anchor the door in place. (02-Apr-04)dozer
|
|
23 viewsThe floor tiling is complete. Now the only thing left to do is do a 10 centimeter tile border around the entire floor. (30-May-04)dozer
|
|
23 viewsThe finished large bathroom attached to the master bedroom. (06-Jul-04)dozer
|
|
23 viewsFinished cabinet section with stainless sink installed. (06-Jul-04)dozer
|
|
23 viewsThe 4" PVC is run into the toilet septic. The mallet is used to create the opening in the cement ring. (31-May-04)dozer
|
|
23 viewsThe 75 liter hot water heater which is mounted on the kitchen wall. This feeds hot water throughout the house.dozer
|
|
23 viewsCompleted small bathroom, toilet and shower enclosure. (06-Jul-04)dozer
|
|
23 viewsAnother shot of electrical PVC conduit. The switchbox mounted above the wall on the left really isn't necessary. It was installed by the first electrician.dozer
|
|
23 viewsThe back of the back outside switch box. (31-May-04)dozer
|
|
23 viewsThis is an after the fact picture - but shows where the ground is run to earth, just to the left of the PVC. This is the front of the driveway adjacent to the patio. The ground wire (grounding electrode conductor) is size 16, which runs to a piece of metal rod with is run into the ground 1.8 meters. The metal is 4 hun. Of significance, since surprisingly the electric department inspector wanted to know the specifics, as now apparently grounded electrical is required by the electric department. (02-Jun-04)dozer
|
|
23 viewsThe inside of the mounted circuit breaker. This is still in progress, the ground wires (grounding electrode conductors) are still to be added.dozer
|
|