|
Most viewed - Original Coolthaihouse Section |
24 viewsMain roof section nearing completion. (27-Apr-04)dozer
|
|
24 viewsClose-up of underside of roof section. dozer
|
|
24 viewsFor comparisons sake, a pair of photos of another house, which shows a wide strip of aluminum flashing (about 1 meter wide) being used which is a better way to do the roof flashing. (15-May-04/09-May-04)dozer
|
|
24 viewsThese window frames show the how a cement base is placed above and below the window frame, and how the red bricks are used to level out the wall above the window. (28-Mar-04)dozer
|
|
24 viewsFinished front door. (19-Aug-04)dozer
|
|
24 viewsWood windows in front of house.dozer
|
|
24 viewsFrom the entry road on the way into the house. (08-Apr-04)dozer
|
|
24 viewsA uninvited guest comes for a visit. This is a 'tocay' lizard of about 12 inches long. They are harmless enough, but during breeding times they make a loud call that sounds like 'tocay' (and thus the name)! (06-Jul-04)dozer
|
|
24 viewsUpdate 16-Aug-04: All the finished houses on the right side of the road now have a problem. No only was the road taken down after the houses were built, but slope of the road does not now allow the water to run. (06-26-04)dozer
|
|
24 viewsThis is the starting shot, showing the plot leveled. The plot starts before the truck on the left and goes to the corner tree line. By this point the plot has already been leveled with fill dirt. (01-Jan-04)dozer
|
|
24 viewsThis shot shows a piece of tile being laid in. A straight line is used as a guide. Also the line is used to evaluate the level of the tile (so that any unevenness in the floor is taken care of). (14-May-04)dozer
|
|
24 viewsThis is a heavy duty (and also just plain heavy!) 75 liter wall mount hot water heater. There are metal brackets on the other side of the wall to add holding support. (04-Jun-04) dozer
|
|
749 files on 63 page(s) |
|
|
|
|
|
14 | |
|
|
|
|
|
|
|