|
Most viewed - Original Coolthaihouse Section |
25 viewsThe house has 5 variable mounted roof fans and 35 down lights. In this room the down lights are on dimmer switches. All of the down lights as well as all of the electric is 'grounded'. (18-Jun-04)dozer
|
|
25 viewsThe bathtub being framed in the large bathroom. It will be supported by 4 columns of red bricks and will be enclosed in tile. There are still two more columns of bricks to be added. (25-Jun-04)dozer
|
|
25 viewsThe metal for the kitchen counter is secured on top of some grc sheeting material and drilled into the wall prior to pouring cement. (26-Apr-04)dozer
|
|
25 viewsA septic being dug. (22-Apr-04)dozer
|
|
25 viewsThe hot water is run through copper enclosed in PVC pipe. (02-Jun-04)dozer
|
|
25 viewsSmall bathroom hot and cold water for the shower stall.dozer
|
|
25 viewsSmall bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozer
|
|
25 viewsThe large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozer
|
|
25 viewsWater runoff pipes run into the septic like this. (05-Jun-04)dozer
|
|
25 viewsThe official electric meter at the street. (21-Aug-04)dozer
|
|
25 viewsThe completed inside of the 8 station circuit breaker. Note the addition of the ground wires (grounding electrode conductor). (09-Sep-04)dozer
|
|
25 viewsAfter the well was in operation for a while, we started having problems with 'dirty' water. Here the original digger uses a pump to pump out the water at the bottom of the well. (13-Jun-04)dozer
|
|
749 files on 63 page(s) |
|
|
|
|
|
12 | |
|
|
|
|
|
|
|