happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section

Most viewed - Original Coolthaihouse Section
DSC04035.jpg
25 viewsThe house has 5 variable mounted roof fans and 35 down lights. In this room the down lights are on dimmer switches. All of the down lights as well as all of the electric is 'grounded'. (18-Jun-04)dozer
DSC04111.jpg
25 viewsThe bathtub being framed in the large bathroom. It will be supported by 4 columns of red bricks and will be enclosed in tile. There are still two more columns of bricks to be added. (25-Jun-04)dozer
DSC02001.jpg
25 viewsThe metal for the kitchen counter is secured on top of some grc sheeting material and drilled into the wall prior to pouring cement. (26-Apr-04)dozer
DSC01130.jpg
25 viewsA septic being dug. (22-Apr-04)dozer
DSC03108.jpg
25 viewsThe hot water is run through copper enclosed in PVC pipe. (02-Jun-04)dozer
DSC03109.jpg
25 viewsSmall bathroom hot and cold water for the shower stall.dozer
DSC03112.jpg
25 viewsSmall bathroom water entry for the toilet and bottom washer. The 4" PVC is the toilet exhaust. dozer
DSC03124.jpg
25 viewsThe large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozer
DSC03149.jpg
25 viewsWater runoff pipes run into the septic like this. (05-Jun-04)dozer
DSC05145.jpg
25 viewsThe official electric meter at the street. (21-Aug-04)dozer
DSC06010.jpg
25 viewsThe completed inside of the 8 station circuit breaker. Note the addition of the ground wires (grounding electrode conductor). (09-Sep-04)dozer
DSC04018.jpg
25 viewsAfter the well was in operation for a while, we started having problems with 'dirty' water. Here the original digger uses a pump to pump out the water at the bottom of the well. (13-Jun-04)dozer
749 files on 63 page(s) 12

Debug Info 
Debug Output: show / hide