Most viewed - Village House |
39 viewsExisting section of rear wall done 4 years prior. The new wall section has been finished and rendered, but no pics of the rendered surface as of yet.dozer
|
|
36 viewsPreparing for the pour of the upper ring beam. The metal is being affixed in place prior to the form work being affixed. dozer
|
|
33 viewsCinder block wall prior to render. Note that he columns were poured after the blocks were laid to prevent cracking/weakness at the junction. dozer
|
|
32 viewsThe poured lateral strength support member, called ?¸??¹€?¸• ?¸”?¸¶?¸‡ ?¹€?¸??¸² ?¹„?¸§?¹‰ (stay dung sow wai) beam which holds column in place. dozer
|
|
30 viewsOne worker is doing the edging on the upper ring beam, the other is rendering the wall surface. Notice again the strength reinforcement which is a poured member that adds lateral strength to the wall segment. dozer
|
|
30 viewsOn 40 meter section prior to completion. dozer
|
|
30 views3 hun (9 mm) the specification of the metal strength. For higher grade metals they will have the strength specification imprinted on the metal surface, in this case SR 24. dozer
|
|
29 viewsPlacing of 3 inch PVC pipe used to aid drainage, placed at the lower level of the wall. dozer
|
|
28 viewsSupport member to add strength to the wall section, along with view of more drainage pvc pipes. dozer
|
|
28 viewsSprinkling water on the wall surface during the rendering process. dozer
|
|
26 viewsThe rear wall section where the new wall being done now was attached to the older wall. This rear section is about 20 meters in length. dozer
|
|
|
|
|
|
|