Most viewed - Village House
DSC02451.JPG
62 viewsThe external bathroom footing with the rebar footing pad in place. dozer
DSC02458.JPG
62 viewsThe footing for the bathroom. The ground beam will be on top of this.dozer
P8010334.JPG
62 viewsdozer
DSC02445.JPG
59 viewsThe form for the ground beam. The ground beam is dug out and formed using concrete blocks. The blocks will be left in the floor. dozer
DSC02446.JPG
58 viewsAnother shot showing the pour of the ground beam. The prefabricated columns have holes which allow the rebar to be affixed to the ground beam. You can see the rebar producing from the column at the 12 o'clock position. The columns are arowan block brand (premium). dozer
DSC02448.JPG
57 viewsAt this stage the roofing has been done (notice if it was heavy roofing the walls would be completed first). dozer
20060911038.jpg
56 viewsInterior wall with electric sunken electric junction box. One row above the box there is a poured ring beam to add strength. dozer
IMG_2834.JPG
56 viewsSide view of the house, still partially finished. The bathroom is in the rear (with two glass blocks). dozer
DSC02582.JPG
54 viewsThe exterior prior to rendering the surface. dozer
DSC02356.JPG
53 viewsMore work on the roof. The cross members are set in place. The helper in blue is holding the ground while the foreman welds. dozer
DSC02675.JPG
52 viewsThe interior after the pour of the floor and walls rendered. The floor was poured 8 - 10 cm and broomed rough in preparation for floor tiles. dozer
IMG_1771.JPG
52 viewsApproximate wall thickness after rendering, about 8 cm. dozer