DSC04140~0.jpg
17 viewsLaying a brick in place.dozer
DSC05065.jpg
17 viewsA close up showing that the post was poured before the blocks were laid in, not after.dozer
DSC05104~0.jpg
17 viewsThe paving stones are set in place.dozer
DSC05151~1.jpg
17 viewsView of planter boxes from patio. (22-Aug-04)dozer
DSC00021~0.jpg
16 viewsSupporting rebar structures, which are made by tying metal strands together, are placed in the completed post hole. There is a metal base on the bottom of the structure. The metal used on the upright pieces is guage 3 hun full, the square supports are 2 hun full. dozer
DSC00029~0.jpg
16 viewsCement is poured using a large metal can as a form, about 30 cm square. (13-Jan-04) dozer
DSC00033~0.jpg
16 viewsAnother shot showing the strip footing with the rebar supports at 2.5 meter intervals. dozer
DSC00037~0.jpg
16 viewsAnother view of the back wall. dozer
DSC05004.jpg
16 viewsThis application was finished off with two main entry posts and an entry gate. A layer of bricks was used on top of these prefabricated entry posts for an artistic look. (06-Jul-04).dozer
DSC04096.jpg
16 viewsStainless gate. (24-Jun-04)dozer
DSC04097.jpg
16 viewsStainless security section.dozer
DSC05069~0.jpg
16 viewsSome Other Shots: A track formed from a two sided piece of metal laid in the ground with the ridge side up. It is cemented in place. (15-Jul-04)dozer