|
Most viewed - Details |
15 viewsA bathtub in the process of being framed. It will be supported by 4 rows of red brick. (25-Jun-04)dozer
|
|
15 viewsA terrible way to do septics. Here one hole is being dug which will house a series of septics. (02-Jul-04)dozer
|
|
15 viewsOne example of a nice looking septic cover. Some varieties are vented, with this type the septic must be separately vented. (09-Jul-04)dozer
|
|
15 viewsConduit is imbedded in the wall. The electric wires run up from the switch box or socket outlet box in this conduit. (22-Mar-04)dozer
|
|
15 viewsConduit which is used to route the electrical. (18-May-04)dozer
|
|
15 viewsThe back of an switch panel showing wiring, the red is positive, white negative and green is the ground. (31-May-04)dozer
|
|
14 viewsSheetrock laid in place with cut outs for lighting and fan. (12-May-04)dozer
|
|
14 viewsThis type of down lighting snaps in place and 'grabs' the drywall. The cheaper varieties are harder to install. (17-Jun-04)dozer
|
|
14 viewsFinished ceiling section. (18-Jun-04)dozer
|
|
14 viewsThe counter after the cement pour. (27-Apr-04)dozer
|
|
14 viewsHere stucco has been affixed.dozer
|
|
14 viewsBathroom doors are normally made of a waterproof plastic material like this one.dozer
|
|
|
|
|
|