|
Most viewed - Basics |
10 viewsThe finished indoor tile floor. (06-Jul-04)dozer
|
|
10 viewsThe roof tile will lie on the 1 by 1, so they must be placed at proper intervals. Notice the cross beam supports which sits on top of the foundation posts. dozer
|
|
10 viewsThis shows most of the foundation columns as well as the partially finished roof truss. The roof height is 2.75 meters about the foundation pillars, the foundation pillars are 3.50 meters to the overall height is 6.25 meters.dozer
|
|
|
9 viewsThe standard high quality brand of cement used, tiger green (suua).dozer
|
|
9 viewsA typical mixing vat. (21-Apr-04)dozer
|
|
9 viewsA stick is used to designate the height of the pour. Here we used a height of 7 centimeters for the pour (allowing 3 centimeter for the tile).dozer
|
|
9 viewsA square mesh pattern is created above the sand sub-flooring.dozer
|
|
9 viewsThe still wet surface is 'roughed' with a broom in preparation for tiling. (20-Apr-04)dozer
|
|
9 viewsPour close up. (21-Apr-04)dozer
|
|
9 viewsThe stucco being smoothed in the finishing coat.dozer
|
|
9 viewsStucco being applied to the rear of the house. (09-Apr-04)dozer
|
|
127 files on 11 page(s) |
|
|
|
|
|
|
|
9 | |
|
|
|
|