DSC01153~0.jpg
10 viewsThe traces of underlying blocks will show until the cement dries. Before painting is a good time to examine the surface for cracks. (25-Apr-04)dozer
DSC02112~0.jpg
10 viewsHere a tile is being set in place.dozer
DSC02114~0.jpg
10 viewsThis shows a 'straight line' of clear nylon line which is used to make sure the rows are laid straight and also to make sure the tops of the tile are flat and at the proper level. dozer
DSC03132~0.jpg
10 viewsWall tile is laid much the same way. This example shows bathroom wall tile being set in place. The wall is scored and pure cement is for maximum adhesion. (03-Jun-04)dozer
DSC05009~0.jpg
10 viewsThe finished indoor tile floor. (06-Jul-04)dozer
DSC00100~1.jpg
10 viewsThe roof tile will lie on the 1 by 1, so they must be placed at proper intervals. Notice the cross beam supports which sits on top of the foundation posts. dozer
DSC00101~2.jpg
10 viewsThis shows most of the foundation columns as well as the partially finished roof truss. The roof height is 2.75 meters about the foundation pillars, the foundation pillars are 3.50 meters to the overall height is 6.25 meters.dozer
DSC02081~0.jpg
10 viewsdozer
DSC01114.jpg
9 viewsThe standard high quality brand of cement used, tiger green (suua).dozer
DSC01122.jpg
9 viewsA typical mixing vat. (21-Apr-04)dozer
DSC01090~0.jpg
9 viewsRoughed surface.dozer
DSC01104~0.jpg
9 viewsPour in a room in progress.dozer