DSC05009~0.jpg
10 viewsThe finished indoor tile floor. (06-Jul-04)dozer
DSC00100~1.jpg
10 viewsThe roof tile will lie on the 1 by 1, so they must be placed at proper intervals. Notice the cross beam supports which sits on top of the foundation posts. dozer
DSC00101~2.jpg
10 viewsThis shows most of the foundation columns as well as the partially finished roof truss. The roof height is 2.75 meters about the foundation pillars, the foundation pillars are 3.50 meters to the overall height is 6.25 meters.dozer
DSC02081~0.jpg
10 viewsdozer
DSC01114.jpg
9 viewsThe standard high quality brand of cement used, tiger green (suua).dozer
DSC01122.jpg
9 viewsA typical mixing vat. (21-Apr-04)dozer
DSC01089~0.jpg
9 viewsA stick is used to designate the height of the pour. Here we used a height of 7 centimeters for the pour (allowing 3 centimeter for the tile).dozer
DSC01101~0.jpg
9 viewsA square mesh pattern is created above the sand sub-flooring.dozer
DSC01103~0.jpg
9 viewsThe still wet surface is 'roughed' with a broom in preparation for tiling. (20-Apr-04)dozer
DSC01105~0.jpg
9 viewsPour close up. (21-Apr-04)dozer
DSC00149~0.jpg
9 viewsThe stucco being smoothed in the finishing coat.dozer
DSC01049~0.jpg
9 viewsStucco being applied to the rear of the house. (09-Apr-04)dozer