8 viewsTo prepare for the pour 2 hun metal is hand tied into a mesh pattern. (20-Apr-04)dozer
|
|

8 viewsAfter the floor is poured a level layer of cement is leveled in a row and tiles are placed on top of it and tapped into place. (13-May-04)dozer
|
|

8 viewsEach tile is carefully tapped into place. (14-May-04)dozer
|
|

8 viewsHere the next tile is set in place. dozer
|
|

7 viewsAfter the cement is dry, tile grout is applied. The grouts come in various colors to match the shade of the tile. (24-May-04)dozer
|
|

7 viewsSome places require small tile fragments to be laid to complete the area.dozer
|
|

7 viewsThe cement under the tile is used to bring the patio flooring to the desired level. (22-Jun-04)dozer
|
|
|