9 viewsThe stucco coat is thick as seen here, at least 1 centimeter thick. (17-Apr-04)dozer
|
|
9 viewsHere is the front bedroom partially tiled. dozer
|
|
9 viewsHere a border or 'skirt' is being laid out. The wall is scored to all for maximum adhesion. The skirt should ideally be done before the wall has been painted. (14-Jun-04)dozer
|
|
9 viewsFinishing off a detail section is a doorway.dozer
|
|
9 viewsThe finished patio tile floor. (30-Aug-04).dozer
|
|
9 viewsFront valley being completed. (30-Apr-04) dozer
|
|
8 viewsThere are 3 grades of CPAC which can be ordered. The quality is comparable to hand mix. (03-Apr-04)dozer
|
|
8 viewsThis is metal rolls, which are sometimes used in floor construction to save money (but not recommended). A one Baht coin in the picture is used for scale. (03-May-04)dozer
|
|
8 viewsRoughed surface.dozer
|
|
8 viewsPour in a room in progress.dozer
|
|
8 viewsMetal is used to add strength to the floor. The metal that comes in rolls is cheaper but is not very good and should be avoided if possible.dozer
|
|
8 viewsAfter the floor is poured a level layer of cement is leveled in a row and tiles are placed on top of it and tapped into place. (13-May-04)dozer
|
|