19 viewsA house being constructed from small red bricks.dozer
19 viewsThe base rebar (4 hun full) is placed on top of a gravel sub footing. The stick represents the middle of the foundation post which is to be poured.dozer
19 viewsThe foundation post holes should be around 1 meter square and 1 meter deep. dozer
19 viewsHere is a house with aluminum windows which uses a wood entry door. (03-Apr-04)dozer
19 viewsThe problem with doing septics this way is that the materials will cross flow between septics. Also the dirt pack will be tighter if each hole is dug individually.dozer
19 viewsStucco being applied to the perimeter wall.dozer
19 viewsFinishing touches applied to the top of the perimeter wall foundation post.dozer
19 viewsYou can see from a close examination of this wall section that the post was not correctly poured around the blocks. (14-Jul-04) dozer