happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section > Original Coolthaihouse Info

Most viewed - Original Coolthaihouse Info
DSC05122~0.jpg
20 viewsPainted and finished wall section with decorative security metal. (15-Aug-04)dozer
DSC05125~3.jpg
20 viewsSimple design with security metals on top. (15-Aug-04)dozer
DSC05164.jpg
20 viewsHere is a one inch cast metal wheel. It just doesn't pay to save on gate wheels as cheap ones like this will wear out very quickly.dozer
DSC05042~0.jpg
20 viewsInterconnected gutters. (19-Jun-04)dozer
DSC01013.jpg
19 viewsA house being constructed from small red bricks.dozer
DSC00072~0.jpg
19 viewsThe base rebar (4 hun full) is placed on top of a gravel sub footing. The stick represents the middle of the foundation post which is to be poured.dozer
DSC00074~0.jpg
19 viewsThe foundation post holes should be around 1 meter square and 1 meter deep. dozer
DSC01012.jpg
19 viewsHere is a house with aluminum windows which uses a wood entry door. (03-Apr-04)dozer
DSC05001.jpg
19 viewsThe problem with doing septics this way is that the materials will cross flow between septics. Also the dirt pack will be tighter if each hole is dug individually.dozer
DSC04142~0.jpg
19 viewsStucco being applied to the perimeter wall.dozer
DSC04143~0.jpg
19 viewsFinishing touches applied to the top of the perimeter wall foundation post.dozer
DSC05064.jpg
19 viewsYou can see from a close examination of this wall section that the post was not correctly poured around the blocks. (14-Jul-04) dozer
329 files on 28 page(s) 7

Debug Info 
Debug Output: show / hide