|

Most viewed - Original Coolthaihouse Info |

10 viewsA square mesh pattern is created above the sand sub-flooring.dozer
|
|

10 viewsThe still wet surface is 'roughed' with a broom in preparation for tiling. (20-Apr-04)dozer
|
|

10 viewsPour close up. (21-Apr-04)dozer
|
|

10 viewsWall section in progress. (13-Mar-04)dozer
|
|

10 viewsWall section - notice how there is a level base above and below the window and red bricks are used to make the upper roof support. (28-Mar-04)dozer
|
|

10 viewsThe traces of underlying blocks will show until the cement dries. Before painting is a good time to examine the surface for cracks. (25-Apr-04)dozer
|
|

10 viewsHere a tile is being set in place.dozer
|
|

10 viewsThis shows a 'straight line' of clear nylon line which is used to make sure the rows are laid straight and also to make sure the tops of the tile are flat and at the proper level. dozer
|
|

10 viewsWall tile is laid much the same way. This example shows bathroom wall tile being set in place. The wall is scored and pure cement is for maximum adhesion. (03-Jun-04)dozer
|
|

10 viewsThe finished indoor tile floor. (06-Jul-04)dozer
|
|

10 viewsThe roof tile will lie on the 1 by 1, so they must be placed at proper intervals. Notice the cross beam supports which sits on top of the foundation posts. dozer
|
|

10 viewsThis shows most of the foundation columns as well as the partially finished roof truss. The roof height is 2.75 meters about the foundation pillars, the foundation pillars are 3.50 meters to the overall height is 6.25 meters.dozer
|
|
329 files on 28 page(s) |
 |
 |
 |
 |
 |
 |
24 |  |
 |
 |
|

|
|
|