|

Most viewed - Original Coolthaihouse Info |

14 viewsWIRE FENCE: This shows the base of the wire perimeter wall. Post holes are dug at about 2.5 meter intervals. The post is inserted and then a temporary support is used to hold the post in place prior to the cement pour. (23-Jun-04) dozer
|
|

14 viewsVery simple gate and metals design. (19-Apr-04)dozer
|
|

14 viewsThe row of bricks is attached to the wall with strips of rebar for strength. (24-Jun-04)dozer
|
|

13 viewsTile roof example. (13-Aug-04)dozer
|
|

13 viewsThe roof tile is wired on to hold it in place. Notice the tile sits in place on the 1 * 1 metal cross beam. (22-Mar-04) dozer
|
|

13 viewsCement work on the roof tiles. (26-Apr-04)dozer
|
|

13 viewsPlastic inserts like these come in easy to install strips, each piece covering 3 sections (like the one shown). The are used to prevent birds and rodents from entering the attic area. (09-May-04)dozer
|
|

13 viewsClose up of wood windows which have been varnished. There are various treatments available for wood, the most common being varnish or urethane, for outside surfaces a good quality varnish will tend to hold up better. (27-Jun-04)dozer
|
|

13 viewsAnother house with wood windows. (06-Jul-04)dozer
|
|

13 viewsThe metal frame is supported by attachment to the truss metal. (05-May-04)dozer
|
|

13 viewsThe counter will be supported by red brick columns. (13-May-04)dozer
|
|

13 viewsPartial wall tile completed. dozer
|
|
329 files on 28 page(s) |
 |
 |
 |
 |
 |
17 |  |
 |
 |
 |
|

|
|
|