|

Most viewed - changnoi's Gallery |

View of the metalwork for Upper Ring Beams32 viewsFrom the soichangnoi
|
|

Front doorway and hall area32 viewsStill awaiting the wall that divides the hallway into a small lounge area behind.changnoi
|
|

Ensuite Bathroom Wall going Up32 viewsDoor Frame in...changnoi
|
|

CPAC Roof Tile Paint32 viewsWow even the right colour well done PMchangnoi
|
|

Bedroom Door In But Wrong Location32 viewschangnoi
|
|

Looking across the site from back to front31 viewsGroundbeam voids filled with sand and compacted.changnoi
|
|

Upstairs Columns with formwork 231 viewschangnoi
|
|

Glass Block Window in stairwell31 viewschangnoi
|
|
|

Master Bedroom Curtains & Aircon31 viewsMitsubishi 18,000 BTU (Mr Slim) 25,000 bahtchangnoi
|
|

Prepare the Metal for Upper Ring Beams30 viewschangnoi
|
|

View of the metalwork for Upper Ring Beams30 viewsCorner and columnchangnoi
|
|
406 files on 34 page(s) |
 |
 |
 |
 |
 |
 |
 |
31 |  |
 |
|

|
|
|