Most viewed - Thaifu T's Gallery |
244 views'Pouring' columns, CPAC deliver concrete; poured into tank. Then 'hand-balled' in small buckets to be poured from the top.Thaifu T
|
|
238 viewsAll columns finished, they are clad in 'cling film', I presume to assist the curing process. Now working on the steel work for the beamsThaifu T
|
|
238 viewsExterior now rendered and primer applied. Now adding bricks to the columns to increase the size. This was going to be the car port but will now be another patio (or GRAND entrance if I want to be a snob)Thaifu T
|
|
230 viewsPouring the beams (2). Greater accuracy is achieved using the tube slung below the bucket. The flow is still controlled by the 'jockey'.Thaifu T
|
|
224 viewsGeneral view of the 'other side of the house'. In the distance is one of the septic tanks; the other has already been sunk into the ground.Thaifu T
|
|
221 viewsLiving room. Walls now primed, ceiling erected.Thaifu T
|
|
210 viewsA more general view of the patio. Also adding concrete surrounds to all windows. The patio ceiling used a different gypsum board, one that does not disintegrate in the rain (I hope).Thaifu T
|
|
208 viewsStarting the steel work for the roofThaifu T
|
|
207 viewsOther side of the living room - rendering in full swing.Thaifu T
|
|
205 viewsKitchen with three walls tiled, waiting for plumbing to be added to far wall. Ceiling now erected - using standard gypsum board.Thaifu T
|
|
204 viewsPlenty of metal work on the roof and the brick work is progressing well on the first floorThaifu T
|
|
203 viewsThese are glass blocks that are a bit different from the norm; and more expensive of course.Thaifu T
|
|
57 files on 5 page(s) |
|