happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Chok Dee #2

Most viewed - Chok Dee #2
IMG_8727.jpg
Floor + Ground Beam Pour106 viewsThe concrete being poured also has a water proofer as a double protective factor to ensure the damp course. The ground beams and floor is being poured. The floor pour is 10 - 12 centimeters. dozer
IMG_8875.jpg
Raw Weld106 viewsA raw (prior to rust painting) weld. The 3.2 mm thick electrode rods are used (as opposed to the 2.6 mm variety) for a heavy duty weld. All welds should be inspected when ever possible. dozer
IMG_8832.jpg
Ring Beam Form Work105 viewsThe form work for the horizontal ring beam is made of plywood. Notice 9mm rebar strips are used to ensure that the form work doesn't deform during the pour. dozer
IMG_9779.jpg
Kitchen105 viewsThe kitchen area sits at the front of the house to the right of the entry door. The area is tiled in a angled terracotta like red tile. There is an open area at the right of the counter for a oven and at the left of the counter for a refrigerator. The exhaust fan sits above where the oven will go. The counters are granite. dozer
cd3gr1.jpg
Well Lit Area105 viewsThe view from the rear looking towards the front door. Notice the plentiful lighting + windows and doors. dozer
IMG_9774.jpg
Front of House104 viewsThe columns at the side of the driveway are made from the large size decorative bricks with a poured concrete center. There are lights controllable from a two way switch which run across the front perimeter wall. The driveway is plenty large enough for a pickup truck. dozer
IMG_9251.jpg
Ceiling Structure103 viewsThe C Lie suspension rails used are the heavier grade and are spaced at about 60 centimeters by 1 meter intervals. Note the tiered ceiling section on the left side (to support the two levels of ceiling structure).dozer
IMG_9777.jpg
Walking in the Front Door102 viewsThe doors and windows are the thicker white aluminum (than normally used in subdivisions) and have a sturdy feel. This is the view from the front entry as we walk in the house. To the right is the kitchen and straight ahead is the front room, with entertainment and TV area straight ahead and off to the right. dozer
IMG_8924.jpg
Rust Painted Weld101 viewsAfter a few days of raw welds any good team will automatically paint the welds. Just a point of procedure to verify. dozer
IMG_8614.jpg
Frame on Spacers100 viewsThe footing frame sits on spacers to ensure it sits equidistant within the footing. dozer
IMG_8737.jpg
Floor Level100 viewsThe ultimate target floor level is indicated by the prepoured concrete cone in the middle of the picture. Once the CPAC is poured this provides a reference for the leveling process. Note that the finished poured floor is not exactly level, the ultimate leveling occurs during the laying of the ceramic floor tiles. dozer
IMG_8986.jpg
Properly Installed Bird Stop100 viewsThis bird stop has about the right clearance, a snug fit is required or otherwise you will get unwanted entry points. dozer
208 files on 18 page(s) 3