PVC Pipe Joined to Tested Section54 viewsThe pipe is being run from the automatic water pump to the previously tested in house section (note the cap on the pipe). Any exposed pipe section will be protected within a concrete pour. dozer
IMG_9245.jpg
Routing Electric Wire to the Perimeter Wall54 viewsElectrics are routed to the perimeter wall for above wall lighting and the exterior mounted door bell. This particular run of electric will be contained in the drive way pour.dozer
IMG_9262.jpg
Electric Conduit Run in Drive Way Columns54 viewsThe yellow conduit is laid in place in the left drive way column. The wire strands are in place to support the wall lighting and the door bell.dozer
IMG_9290.jpg
Driveway Pour in Process54 viewsHand mix was used on the driveway. Red bricks are used as a starting spacer to ensure that the rebar mesh doesn't sit on the ground, further adjustment is done by the 'pull into place method' as the pour progresses. The meshing is pulled to be centered within the 10 centimeter pour.dozer
IMG_9349.jpg
Die Pigment54 viewsThe premixed natural die pigment is added to the concrete render mixture. The amount of sand aggregate and cement must not vary to ensure consistency in the resultant coloration. dozer
IMG_9322.jpg
Initial Render Coat54 viewsAn initial render coat will be applied and left rough. This then is allowed to dry over a period of time, prior to applying the colored render coat.dozer
IMG_9086.jpg
Glass Blocks Offset54 viewsThe exterior bathroom wall showing the glass blocks have been laid in place to be level with the exterior wall after the 2.5 centimeter of render is applied. dozer
IMG_9075.jpg
Finished Surface54 viewsThis is the finished surface after smoothing. Close examination ensures that no hairline cracks are present. Cracking is a sign of improper rendering, either via improper mixing or application. dozer
IMG_8861.jpg
Glass Blocks54 viewsA concrete mix the same as that used to lay tiles is used to firm the bricks in place. dozer
IMG_8843.jpg
Capped Pipes53 viewsClose up of the caps temporarily used on the drain pipes.dozer
IMG_9452.jpg
Typical Power Point Installation53 viewsThis shows a power point with a inbound cable co ax TV junction. There is also a telephone jack. Each power point and switch box is temporarily covered with this plastic to prevent splatter during painting and other construction activities. dozer
IMG_9088.jpg
Surface Prep for Wall Tiles53 viewsThe surface here is being prepped for wall tiles. dozer