Finished Submerged Water Tank56 viewsThe finished tank, note the inbound water pipe (top), the outbound water pipe (center) and the electric inbound yellow conduit which feeds the solenoid valve within the tank. dozer
|
|

Heavy Duty Electronic Valve Solenoid Control56 viewsMost often you will find water tanks rigged with a toilet float type of on off valve. These cause the pump (in this case a heavy duty submerged franklin) to turn on an off frequently. This wastes electricity and keeps the water 'churning' all the time never giving any impurities time to settle to the bottom. With this type of electronic valve the desired off/on point can be adjusted by moving the middle yellow adjustment tube.dozer
|
|

Front Brick Columns56 viewsThe front brick columns sit on either side of the drive way. The columns contain the electric conduit which is run up to the top to support the exterior wall lighting. The inside of the columns is filled with concrete.dozer
|
|

Close Up of Drainage56 viewsThe drainage opening on the right side of the driveway. dozer
|
|

Brick Column being Filled56 viewsThe brick column being filled with concrete. The top ring beam of the perimeter wall has been formed using form wood and is ready to be poured.dozer
|
|

Inbound Electric Line tie in55 viewsThis shows where the inbound electric main line will enter the house, at the roof line above the patio.dozer
|
|

Electric Routed to Wall Lighting55 viewsElectric is routed in the upper perimeter wall ring beam. dozer
|
|

Smoothing the Render55 viewsAfter setting in a bit more the surface is worked smooth with the use of a render's darby in combination with a wet sponge. dozer
|
|

Glass Block Offset55 viewsThe glass blocks are laid in to be even with the outside wall after rendering. This shows the bathroom wall, the clear blocks (opaque) are in the shower stall, the blue blocks are above the sink.dozer
|
|

Level Line55 viewsA long clear plastic tubing is used to create a level line which will be used to set the top level for the floor tiles. The tube is filled with water, on one end a line is marked at the water line. At a different area perhaps several meters away another mark is made (in is a two man process). This two independent marks will be at the same level and measurement can be made from this point downwards to determine the target level for the tiles. dozer
|
|

Archway Completed Section on the Right54 viewsThe finished archway prior to rendering: notice the lower portion is poured within formwork and the upper portion is brick and mortar. The heavy lower portion is supported by a rebar strand framework which was welded on to the box section at the top. dozer
|
|

Hole for Submerged Water Tank54 viewsThis shows the start of the 1800 liter underground water tank. dozer
|
|