|

Most viewed - Chok Dee #2 |

Column Squaring59 viewsThe rough columns will be squared. Here a fishing line is run vertically down to a concrete nail in the floor which indicates the target line for the corner of the column, the lines indicate the external edges. dozer
|
|

Pressurized Water Pipe Test58 viewsA water test must be preformed early on in the building process. This test ensures that there are no leaks within the system. The automatic pump is set up and a run-in test is preformed for 24 hours. If there are any leaks in the system the pump will cycle on during the test. dozer
|
|

Openings in the Wall58 viewsThese opening in the perimeter wall let some light in and give the garden area a nicer feel that if the wall was solid.dozer
|
|

Putty58 viewsThe fill putty is colored using the urethane as applied to the original wood trim to achieve a matching color. dozer
|
|

Wall Tiles Applied58 viewsThe lower row of tiles is supported by concrete nails. This level is where the floor tiles will be after they are laid. Spacers are used to ensure consistent spacing. The surface is roughed prior to laying the tiles.dozer
|
|

Tank Service57 viewsThe inside of the tank being cleaned of any debris.dozer
|
|

Lanko K11 Waterproofing57 viewsThe cement skim coat which is evenly applied to the inside of the water tank as a double check against leakage. Note that the Sika water proofing which is mixed into the cement should be sufficient. dozer
|
|

Installing the Main Electric Panel57 viewsThe main electric panel contains associated breakers running from 10 w up to 32 w depending on the load of devices on the particular station. There are 6 stations in the house. All electric equipment is Bticino Matix.dozer
|
|

Inside view of Junction Box57 viewsOnly secure wire fasteners are used in a totally electric tape free installation. This means less to wear out and go wrong over time.dozer
|
|

Applying the Color Render Coat57 viewsThe color render coat is applied much the same as a normal render coat. In preparation however a previous coat was applied in a rough state and allowed to set for a week, which prevents the underlying block shape from bleeding through. dozer
|
|

Stone Trim being Applied57 viewsThe stone trim being cemented into place. The stone tiles are offset for effect. dozer
|
|

Additonal Waterproofing Agent Applied to the Bottom56 viewsLanko K11 waterproofing agent is skim coated on the bottom (as shown) and will be applied to the sides of the enclosure as well. dozer
|
|
208 files on 18 page(s) |
 |
 |
 |
 |
 |
 |
14 |  |
 |
 |
|

|
|
|